Project Description:
This Phase 2 project is a followup to Phase 1 (conducted two years earlier in 2004). The City of Issaquah restored 600 feet of Issaquah Creek in a 4.6 acre area.

Restoration Features:

  • Installed 20 log structures (large woody debris — LWD) in the stream for fish habitat
  • Removed bank fill to improve connection of the stream to the floodplain area
  • Removed invasive plants and replaced with native vegetation.